Beds

ZX-1283 Bed

35 photos
ZX-1283 Bed, photo 1/35 ZX-1283 Bed, photo 2/35 ZX-1283 Bed, photo 3/35 ZX-1283 Bed, photo 4/35 ZX-1283 Bed, photo 5/35 ZX-1283 Bed, photo 6/35 ZX-1283 Bed, photo 7/35 ZX-1283 Bed, photo 8/35 ZX-1283 Bed, photo 9/35 ZX-1283 Bed, photo 10/35 ZX-1283 Bed, photo 11/35 ZX-1283 Bed, photo 12/35 ZX-1283 Bed, photo 13/35 ZX-1283 Bed, photo 14/35 ZX-1283 Bed, photo 15/35 ZX-1283 Bed, photo 16/35 ZX-1283 Bed, photo 17/35 ZX-1283 Bed, photo 18/35 ZX-1283 Bed, photo 19/35 ZX-1283 Bed, photo 20/35 ZX-1283 Bed, photo 21/35 ZX-1283 Bed, photo 22/35 ZX-1283 Bed, photo 23/35 ZX-1283 Bed, photo 24/35 ZX-1283 Bed, photo 25/35 ZX-1283 Bed, photo 26/35 ZX-1283 Bed, photo 27/35 ZX-1283 Bed, photo 28/35 ZX-1283 Bed, photo 29/35 ZX-1283 Bed, photo 30/35 ZX-1283 Bed, photo 31/35 ZX-1283 Bed, photo 32/35 ZX-1283 Bed, photo 33/35 ZX-1283 Bed, photo 34/35 ZX-1283 Bed, photo 35/35
Sourcing notes

What we confirm before quoting

Model ZX-1283 is one of our bed references from China. We confirm the frame and slat system, headboard fixing, mattress size and carton with the workshop before quoting. If you need a different size, finish or fabric, send the reference and we will check what the factory can change without a new mould.

  • Frame and slat system. The joint, slat spacing and centre support are checked against the approved sample.
  • Headboard fixing and mattress size. The fixing method and nominal mattress size are confirmed before production.
  • Disassembly and carton. Flat-pack joints, corner protection and carton size are confirmed before loading.
Inspection

What we check before the balance

We inspect the pre-production sample, the production run and the packed order. You receive photos and video at each stage, and the balance is released only after you approve.

Send the reference and quantity →

How we work →

Request a Quote →

Contact →